Repair is underway on the section km 103 + 800 - 107 + 800 of the N-14 Aleksandrovka-Kropyvnytsky-Nikolaev highway in the Kropyvnytskyi region near the village of Poltavka.

Now there is a device of the lower structural layer from the screening.

The project has planned to expand the carriageway from 7 m to 8.5 m. And to carry out a series of earthwork with the further construction of new structural layers of pavement. 

The design of the pavement provides for milling of the old pavement, the device of the lower structural layer of screening with a thickness of 20 cm, the upper 25-cm layer of the base from ЩПС-070, the strengthening of the base by recycling. Then a device for a two-layer coating of asphalt mix: the bottom layer of coarse-grained dense asphalt concrete 10 cm and the top layer of the coating of gravel-mastic asphalt concrete (ЩМА 20) 5 cm.

After the device of the roadway, roadsides will be arranged, road markings will be applied and signs will be set. 

Currently, work is being done on the left driveway of the road.

About 20 employees and 10 units of Rostdorstroy equipment are involved in the work at the facility.

 

It is planned to hand over the object before the end of November of this year.

We are always open for cooperation.
and welcome to new interesting projects.

The central office is located at: 65009, Odessa, 1A, Genuezska Str.

Phone +38 (048) 784 75 30

Send mail